Restaurant Renovation Project

The Expert staff at Service Experts Plumbing recently completed the plumbing portion of a major renovation project at Gus’s Carryout 8694 W Grand River Ave, Brighton, MI 48116. Our dedicated staff worked around the clock to removed and replaced all the underground sewer, remove and replace all of the hot and cold water service mains, and reinstalled all the new equipment. The project was fast tracked and scheduled to be completed in under 4 weeks, thus requiring us to work 24 hour shifts to maintain the accelerated project schedule.

The Project included:

Furnish and Install Bradford White 100gal Ultra High Efficiency, Fast Reclaim Water Heater

Installation of 250′ 3/4″ Copper Pipe

Installation of 300′ 1.5″ 2″ and 3″ PVC Sch 40 Drain Pipe

Installation of 1.5″ and 1.25″ Steel Gas Mains

Installation of Floor Sinks and Floor Drains

Installation of Mop Tuba

Installation of Toto water closet with Sloan Auto Flush Valve

Installation of 3 compartment sink

Installation of 4 Stainless Steel hand sinks

 